Cloud Migration Team: How to Staff a One-Off Project

A cloud migration team is a group of engineers assembled to move applications and data from one environment to the cloud, sized to the phases of the migration and released when it ends. The usual way to staff one without full-time hires is a small core from your own team plus engineers added for the project, through a consultancy, contractors or staff augmentation.
The model you pick decides how much of the knowledge stays with you after cutover. Below: the signs you need a dedicated team, how to decide between reassigning people and adding them, who to staff at each phase, what each model costs and how to scale down afterward. If the migration starts this quarter, start with the staffing plan.
Signs you need a dedicated cloud migration team
You need a dedicated cloud migration team when the migration has a deadline your current engineers can't meet without stopping product work, when the skills it needs, such as infrastructure as code or data migration, are thin on the team, or when the work runs for months with a clear end.
The clearest tell is the roadmap. If moving engineers onto the migration means pausing features customers are waiting for, the migration needs its own people.
The second tell is the skills list. Teams that run well on a managed platform often have few people who have planned a cutover, rewritten deployment pipelines or moved a production database with near-zero downtime.
Reassign your team or add a migration team?
Reassign your own engineers when the migration is small and the roadmap can slow down; add a migration team when the roadmap has to keep moving or the migration needs skills the team lacks. A common middle ground is a few of your engineers working alongside added ones.
| Signal | Points to reassigning your team | Points to adding a migration team |
|---|---|---|
| Scope | A few services, low risk | Many services, data and pipelines |
| Roadmap | Can slow down for a quarter | Has to keep shipping |
| Skills | Cloud experience already on the team | Few people have run a migration |
| After cutover | The same people run the new setup | Most of the extra capacity is no longer needed |
| First move | Plan the migration in-house | Add engineers for the project |
How to staff a team for a cloud migration
Staff a team for a cloud migration by phase: an architect to assess and plan, cloud and application engineers to migrate, and a smaller crew to stabilize and optimize after cutover. Keep at least one of your own engineers on the team throughout, so the knowledge stays in the company.
- Assess and plan: a cloud architect maps applications, data and dependencies, picks the approach for each, and sets the order.
- Build the foundation: cloud or DevOps engineers set up accounts, networking, security and infrastructure as code.
- Migrate: application engineers and cloud engineers move services and data in waves, with testing and rollback plans.
- Stabilize and optimize: a smaller crew tunes cost and performance, then hands over to the team that runs it.
Take an illustration, and swap in your own numbers: a 26-week migration. A senior cloud architect works alone for the first 4 weeks. For the next 18, two senior cloud engineers and two mid-level application engineers join. For the last 4, the architect and one cloud engineer stay.
That plan adds up to 66 senior and 36 mid-level engineer-weeks. Through Tecla, at the Engineering averages of $58 an hour for seniors and $48 for mid-level engineers, over 40-hour weeks, it costs about $222,240.
The same weeks at fully loaded US cost come to about $519,000: about $145 an hour for a New York senior and about $95 for a mid-level engineer at the national median, from BLS wages with wages at 68.5% of employer costs, per the BLS. That's about 57% less, before counting what permanent hires cost after cutover.
What a migration costs with the wrong team
A migration staffed with permanent hires costs time up front and salary afterward; one staffed by pulling engineers off the product costs the roadmap. Engineering roles take about 62 days to fill, so in a 26-week plan, permanent hires join around week 9.
After cutover, most of that extra capacity has nothing left to migrate. Five permanent engineers keep costing at the same rate, whether or not the roadmap needs cloud specialists.
Adding people late carries its own risk. Fred Brooks observed in The Mythical Man-Month that adding people to a late software project makes it later, because onboarding takes time from the engineers already doing the work.
In a migration, the architect pays that cost, so staff the team before the first wave.
Project-based engineering team: four models
A project-based engineering team comes from four places: your own engineers reassigned, a migration consultancy, contractors, or engineers added through staff augmentation. Each puts the knowledge and the control in a different place.
A consultancy fits when no one in the company can design the target setup and you'd sooner buy the plan than build it. Combining the two works well: a consultancy or a senior architect for the design, and augmented engineers to carry out the waves inside your codebase.
Staff augmentation fits most migrations because the added engineers work in your repositories, pipelines and reviews, so the people who run the new setup see how it was built.
How nearshore staffs a cloud migration
Nearshore staff augmentation adds engineers from Latin America who work your hours and join your team as in-house members, on rolling monthly terms for most engagements, with no multi-year lock-in. That fits a team that grows for the migration and shrinks after it.
Shared hours matter most at cutover. An engineer in Bogotá shares seven to eight working hours with a New York 9-to-5, so release windows, incident calls and rollbacks happen with everyone online.
Research in Organization Science found that real-time communication between colleagues drops as time-zone distance grows.
How Tecla builds your migration team
Tecla places vetted Latin American engineers into US teams, full-time or part-time, with a shortlist as soon as 3 days. Fewer than 1% of applicants pass Tecla's four-layer vetting, which includes an engineer-led technical assessment.
For a migration, that means the cloud side and the application side from one place: you can hire AWS developers and hire nearshore DevOps engineers for the foundation, and application engineers for the waves.
If a migration is on the calendar, tell us the scope and the timeline. Every placement carries a 90-day replacement guarantee, and the team can shrink with the work after cutover.
Frequently asked questions
Who do you need on a cloud migration team?
A cloud architect to assess and plan, cloud or DevOps engineers to build the foundation and pipelines, and application engineers to move and test services. Larger migrations add a data engineer for databases and a security specialist. Keep at least one of your own engineers on the team so the knowledge stays after cutover.
How many engineers does a cloud migration take?
It depends on the number of services, the data and the deadline, and it changes by phase. In our 26-week illustration, one architect plans for 4 weeks, five engineers migrate for 18, and two stabilize for the last 4, about 102 engineer-weeks in total.
Should I hire full-time engineers for a cloud migration?
Only for the roles you'll need after the migration, such as the people who will run the new platform. For the rest, project-based staffing fits better: full-time engineering roles take about 62 days to fill, and keep costing after cutover.
Should I use a cloud consultancy or my own team for a migration?
Use a consultancy when nobody in the company can design the target setup, and your own team, with added engineers, when you can design it and need hands to build it. Combining the two works well: outside expertise for the plan, and engineers inside your team for the waves.
What happens to the migration team after cutover?
Plan it from the start. Your own engineers take over running the new setup, the architect and one engineer stay through stabilization, and the added engineers roll off as the waves finish. With staff augmentation, you then scale the team down.
How do I keep the product roadmap moving during a migration?
Keep most of your product engineers on the roadmap and staff the migration with a small core of your own people plus added engineers. Freeze only the changes that touch the services being moved, and schedule cutovers between releases.
Can I scale a Tecla team down after the migration?
Yes. Most Tecla engagements run on rolling monthly terms, with no multi-year lock-in, so the team can shrink with the work after cutover.
How does Tecla vet engineers?
Every candidate goes through four layers: AI screening, a recruiter interview for communication and English, an engineer-led technical assessment, and an AI-fluency screen. Fewer than 1% are accepted.
How fast can Tecla send candidates?
A shortlist of vetted candidates arrives as soon as 3 days.
What does Tecla's rate include?
One all-inclusive rate per professional, covering vetting, EOR and compliance, equipment and benefits management, and a 90-day replacement guarantee. You pay only after you hire.